Construction ready to begin at Edgewater site

.
This is a very steep site, with a high, caving bank over the lake.  Let's hope Engineering is up the the challenge that erosion control will present!  Trees are being cut.











Erosion control plans often "limit" sediment loss to no more than 7.5 tons/acre. For this 2-acre site, that would "allow" 15 tons of sediment to the lake, LEGALLY.