.
On Sunday March 10, Findorff was again unprepared for rain and thaw. The rain amounted to .93 inches, augmented by melting snow.
The area furthest from the lake had been recently excavated, but no erosion controls were visible along the fence.
Out on the ice of Lake Mendota, Findorff had been dumping snow excavated from the construction site. The dumping of snow was intentional--it was in large piles dropped by a power shovel.
Showing posts with label Findorff Construction. Show all posts
Showing posts with label Findorff Construction. Show all posts
6/14/11
Not sustainable--the construction industry in Madison
.
There's construction all over downtown Madison. Dust is being tracked onto streets every day, and is being blown out of construction sites on windy days.
Covering sources of dust
Findorff site before covering, & after. Click to enlarge.
Subscribe to:
Posts (Atom)


