.
This is a summary of the sediment spills into Monona Bay by construction at 1102 S. Park St., by the Ghidorzi Companies.
The demolition and construction progressed from May of 2012 to July of 2013. During that time, Steve Vanko and David Thompson documented--with the photos shown below--13 sediment spills to the bay, and one extreme dust incident.
These spills were the result of failure to follow many elements of the required erosion control plan, which we'll document elsewhere.
Since 1102 S. Park Street has contaminated soil,* and because soil particles carry phosphorus, muddy runoff from the site is real pollution.
Showing posts with label stormwater. Show all posts
Showing posts with label stormwater. Show all posts
7/14/13
Subscribe to:
Posts (Atom)
